.

Tuesday, April 30, 2019

Redesign project Essay Example | Topics and Well Written Essays - 2500 words

Redesign project - Essay ExampleMixing such pertinent equipment as nails and return materials among others whitethorn compromise the safety of the installation process. For a safer installation process, only an experienced professional and not every other person who may obtain the manual mustiness do the installation. Warning/ circumspection Never, stand or walk on the glass panel. Such actions may result in the fast breakage of the panel thereby jeopardizing the equipment besides potential risk it presents to the installer. Protect the sheathing from any writer of wetness at all costs. Failure of such during the installation process may ca expend leaks whence do not work during stormy weather. Do not cut or attempt to modify the rise systems. Ensure the use of the equipment deliverd by the company and replacing damaged equipment. The modification of such important equipment may compromise the safety of the work environment. Points to consider when selecting the installation p osition The point of location is one of the almost critical contri furtherors to the dominance of the solar system. The installer must therefore consider several factors that contribute to both the potentness and the safety of the installation process as listed below Do not locate the systems near salt-water locations. The installer must maintain a 0.3 meters radius from such locations. Salt water corrodes the surface thus reducing the use of the systems. Inspection of the roof support system is vital and the installer must ensure that the roof is strong sufficiency to endure the weight of the panel. In inspecting the roof support system, the installer must check to ensure that the support is unchangeable and will therefore last as long as the panel lasts. Inspection of the roof is equally important and the installer must ensure that the roof is capable not only of supporting the panel but also expose the panel to adequate sunlight. The condition of the roof should promise the longevity of the panel any repairs to the roof must take place before the installation as subsequent repairs may pick the use of the panel. More importantly, the roof must prove the ability to support the weight of the panel and provide ease of fit out. Please note Install the panels at approximately twelve inches from the ridges of the roof. Additionally to ensure the effective usability of the panels, do not install the solar panels in either windy or stormy regions as such are not the best weather conditions for the use of the panels and may also pose hard risks during the installation process. PV Modules Wiring is essential during the installation process and presents potential risks to both the installer and the users of the solar panels. The installer must therefore ensure that The wiring process is in accordance to the dictates of the National Electrical Code. In this, the government outlines the property of wires to use and the equipment to use during wiring. Failure to comply with the provisions is a criminal offense. Note that the solar panels mother electric current with any minimal exposure to direct sunlight at any season and thus presents potential shock risks to both the installer and anybody else. The installer must prevent any contact with naked wires during the wiring process and discourage the presence of anybody not

No comments:

Post a Comment